Place of Origin:
China
Brand Name:
zhongloo
Certification:
ISO9001
Model Number:
Geomat
Contact Us
Erosion Control Geomat Plastic 3d Geomat For Railway Construction
Geomat Production:
Geomat is a new-typed seed planting material with tridimensional structure, which can effectively prevent the soil being washed away, increase the area of the virescence, improve the environment.
Technical Parameters:
Geotechnical mat | |||||
item | Specification | ||||
Type | SPS-10 | SPS-20 | SPS-30 | SPS-40 | SPS-50 |
Thickness(mm≥) | 10 | 20 | 30 | 40 | 50 |
Compressive strength≥ | 250KPa | ||||
Tensile Strength≥ | 6.0KN/m | ||||
Elongation≥ | 40% | ||||
Vertical permeability coefficient≥ | 5*10^-1m³ | ||||
Porosity | 80-90% | ||||
Horizontal hydraulic conductivity | 200KPa,≥50*10^-3㎡/S |
Application of Geomat:
It can protect the ground surface being corroded before the turf is growing up, and fix the seeds.
The compound protection layer formed after the grass grows up can endure washing by high level and high speed water. It can be a substitute of the concrete, bitumen, stone etc to be the slope protection material. It has mainly been used in highway, railway, riverway, embankment, hillside etc.
Quality assurance
1.On a regular basis or as per your request,we entrust national testing agencies to conduct quality inspections
2.Strictly in accordance with the ISO9001-2008 international quality system standard,we monitor and manage the whole process throughout production,quality testing,and measurement to ensure product quality
3. For quality-related construction delay or substandard construction(except for damage or losses due to customer's responsibility or irresistible natural disasters),we have refunding,replacement,and repair services.We will respond to customers' feedbacks on quality issues within 24 hours.
FAQ:
Q: Do you provide samples ? is it free or extra ?
A: Yes, we couldoffer the sample for free charge but do not pay the cost of freight.
Q: How long is your delivery time?
A: Generally it is 5-10days if the goods are in stock. or it is 10-15 days if the goods are not in stock, it is according to quantity.
Send your inquiry directly to us